Solar panel installation in Nikol
- 5.6 kWh/m² of sun a day
- Torrent Power / UGVCL net metering
- Up to ₹78,000 subsidy
Is solar worth it in Nikol?
A well-installed system in Nikol makes about 4.3 units per kW every day, averaged over the year. So a typical 3 kW home system here produces around 387 units a month, which covers most of the bill for an average family. We install rooftop and ground-mounted solar across Nikol and nearby areas of Ahmedabad.
Most of our Ahmedabad work is on bungalows and tenements in the western suburbs, flat roofs on society buildings, and factory sheds in Sanand, Changodar, Vatva and Naroda.
Depending on where you are in Ahmedabad, your power comes from either Torrent Power or UGVCL. Check the name printed on your light bill. We'll file the net meter application with whichever one it is.
For businesses in Ahmedabad, mainly textiles, pharmaceuticals and automobile & auto-components, solar cuts the daytime power cost. A 100 kW rooftop plant here can produce about 1,56,950 units a year.
Good to know in Central Gujarat: shade on city roofs
On crowded city roofs, water tanks, staircase rooms and taller buildings next door can throw shade for part of the day. We check shade at the site survey and use elevated structures where needed. Even a little shade on one panel can pull down the whole string.

- About 4.3 units per kW per day in Nikol
- Net metering with Torrent Power / UGVCL
- Up to ₹78,000 subsidy for homes
- Tier-1 panels with a 25-year performance warranty
- Hot-dip galvanised structures that won't rust
- Free site visit and after-sales service
Solar services in Nikol
Small home systems, big factory roofs, open land and farm pumps. Pick what fits your property.
1 kW to 10 kWResidential Rooftop SolarOn-grid solar for your house with net metering. You get up to ₹78,000 back under PM Surya Ghar, and we do all the paperwork with your electricity company.Learn more
5 kW to 500 kWHousing Society SolarSolar on the society terrace to run lifts, water pumps and common lights. It brings down the common electricity bill, and the society can claim subsidy too.Learn more
10 kW to 1 MWCommercial SolarSolar for offices, showrooms, hotels, hospitals, schools and warehouses. Commercial tariffs are high, so each unit you make saves more, and you can claim accelerated depreciation.Learn more
50 kW to 5 MW+Industrial SolarRooftop and captive solar plants for factories and GIDC units. Built for heavy loads, with HT or LT metering and remote monitoring so you can check generation every day.Learn more
25 kW to 10 MW+Ground-Mounted SolarSolar plants on open land for factories, farms and investors. Panels face the best angle, so you get more units per kW, and we handle the civil, electrical and approval work.Learn more
3 HP to 10 HPAgricultural Solar & PumpsSolar pumps for borewells and irrigation, so you don't spend on diesel or wait for farm power hours. We also help with PM-KUSUM scheme applications.Learn more
Solar savings calculator for Nikol
Set your average monthly bill. You'll see the system size, subsidy and how long it takes to pay back.
- Recommended system
- 3.5 kW
- Generation per month
- 451 units
- Savings per year
- ₹36,000
- Central subsidy
- ₹78,000
- Your cost after subsidy
- ₹1,14,500
- Payback period
- 3.2 years
Estimate for a home on-grid system in Nikol, assuming 4.3 units per kW per day, ₹7/unit and about ₹55,000/kW before subsidy. Your exact quote depends on your roof, panel brand and DISCOM charges.
Get an exact quotePM Surya Ghar subsidy
If you own a home in Nikol, the central subsidy is paid straight into your bank account once the system is running.
| System size | Central subsidy | Suited to monthly use |
|---|---|---|
| 1 kW | ₹30,000 | 0 to 150 units |
| 2 kW | ₹60,000 | 150 to 300 units |
| 3 kW and above | ₹78,000 (maximum) | Above 300 units |
We register you on the national portal and take care of the Torrent Power / UGVCL approval, inspection and net meter. How the subsidy works
How it works
You deal with one person from the first call until your system is switched on.
- 1
Free site visit
Our engineer comes to see your roof, checks for shade and goes through your last year of light bills.
- 2
Design and quote
You get the system size, expected units, savings and a clear price with the subsidy already shown.
- 3
Subsidy and DISCOM forms
We register you on the PM Surya Ghar portal and file the net meter application with your electricity company.
- 4
Installation
A home system usually goes up in 1 to 3 days, with galvanised structures and tier-1 panels.
- 5
Net meter and switch-on
Your DISCOM fits the new meter, the system is switched on, and the subsidy comes into your bank account.
Solar installation near Nikol
Nearby areas in Ahmedabad
- Satellite
- Bopal
- South Bopal
- Shela
- Prahlad Nagar
- Vastrapur
- Bodakdev
- Thaltej
- Shilaj
- Ambli
- Science City
- Sola
- Gota
- Chandlodia
- Ghatlodia
- Memnagar
- Naranpura
- Navrangpura
- Ellisbridge
- Paldi
- Vasna
- Jodhpur
- Vejalpur
- Sarkhej
- Makarba
- Maninagar
- Isanpur
- Ghodasar
- Khokhra
- Vastral
- Naroda
- Bapunagar
- Odhav
- Ranip
- New Ranip
- Sabarmati
- Chandkheda
- Motera
- Nava Vadaj
- Vatva GIDC
- Naroda GIDC
- Odhav GIDC
- Narol
- Changodar
More of Ahmedabad district
Questions people in Nikol ask us
How much does a 3 kW solar system cost in Nikol?
Most 3 kW on-grid systems in Nikol cost ₹1.6 to 1.9 lakh before subsidy. You get ₹78,000 back from the PM Surya Ghar scheme, so you pay roughly ₹85,000 to ₹1.1 lakh in the end. The exact price depends on the panel brand, inverter and how high the structure needs to be.
How many units will solar panels generate in Nikol?
Around 4.3 units per kW per day on average, which is about 129 units a month. A 3 kW system gives you roughly 387 units a month. Summer months are higher and monsoon months are lower.
Who handles net metering in Nikol?
In Ahmedabad it's either Torrent Power or UGVCL, depending on your area. Look at the top of your electricity bill to see which one you have, and we'll apply to the right one for you.
How long does installation take in Nikol?
The panels usually go up in 1 to 3 days once the design is final. The full process, including Torrent Power / UGVCL approval, the net meter and commissioning, normally takes 3 to 6 weeks.
Do you also do factories and commercial buildings in Ahmedabad?
Yes. We install commercial and industrial rooftop systems and ground-mounted plants from 10 kW up to several MW across Ahmedabad, including for textiles, pharmaceuticals and automobile & auto-components units.