Solar panel installation in Deesa
- 5.8 kWh/m² of sun a day
- UGVCL net metering
- Up to ₹78,000 subsidy
Is solar worth it in Deesa?
Deesa gets around 5.8 kWh of sunlight per square metre on an average day. That's among the best in India. So a typical 3 kW home system here produces around 405 units a month, which covers most of the bill for an average family. We install rooftop and ground-mounted solar across Deesa taluka.
Banas Dairy is based here, and Palanpur and Deesa are the main business towns. Potato cold storages, dairies and farms make up a big part of our enquiries.
Your power here comes from Uttar Gujarat Vij Company Ltd (UGVCL). We file the net meter application with UGVCL, follow up until the meter is installed, and register you on the PM Surya Ghar portal so the subsidy reaches your bank account.
For businesses in Banaskantha, mainly dairy, agriculture (potato, castor) and marble & granite, solar cuts the daytime power cost. A 100 kW rooftop plant here can produce about 1,64,250 units a year.
Good to know in North Gujarat: heat and dust
Summer here often goes past 45°C. Panels make a little less power when they get very hot, so we raise the structure to let air flow underneath. Dust from farms and roads settles quickly, so regular washing makes a real difference.

- About 4.5 units per kW per day in Deesa
- Net metering with UGVCL
- Up to ₹78,000 subsidy for homes
- Tier-1 panels with a 25-year performance warranty
- Hot-dip galvanised structures that won't rust
- Free site visit and after-sales service
Solar services in Deesa
Small home systems, big factory roofs, open land and farm pumps. Pick what fits your property.
1 kW to 10 kWResidential Rooftop SolarOn-grid solar for your house with net metering. You get up to ₹78,000 back under PM Surya Ghar, and we do all the paperwork with your electricity company.Learn more
5 kW to 500 kWHousing Society SolarSolar on the society terrace to run lifts, water pumps and common lights. It brings down the common electricity bill, and the society can claim subsidy too.Learn more
10 kW to 1 MWCommercial SolarSolar for offices, showrooms, hotels, hospitals, schools and warehouses. Commercial tariffs are high, so each unit you make saves more, and you can claim accelerated depreciation.Learn more
50 kW to 5 MW+Industrial SolarRooftop and captive solar plants for factories and GIDC units. Built for heavy loads, with HT or LT metering and remote monitoring so you can check generation every day.Learn more
25 kW to 10 MW+Ground-Mounted SolarSolar plants on open land for factories, farms and investors. Panels face the best angle, so you get more units per kW, and we handle the civil, electrical and approval work.Learn more
3 HP to 10 HPAgricultural Solar & PumpsSolar pumps for borewells and irrigation, so you don't spend on diesel or wait for farm power hours. We also help with PM-KUSUM scheme applications.Learn more
Solar savings calculator for Deesa
Set your average monthly bill. You'll see the system size, subsidy and how long it takes to pay back.
- Recommended system
- 3 kW
- Generation per month
- 405 units
- Savings per year
- ₹34,020
- Central subsidy
- ₹78,000
- Your cost after subsidy
- ₹87,000
- Payback period
- 2.6 years
Estimate for a home on-grid system in Deesa, assuming 4.5 units per kW per day, ₹7/unit and about ₹55,000/kW before subsidy. Your exact quote depends on your roof, panel brand and DISCOM charges.
Get an exact quotePM Surya Ghar subsidy
If you own a home in Deesa, the central subsidy is paid straight into your bank account once the system is running.
| System size | Central subsidy | Suited to monthly use |
|---|---|---|
| 1 kW | ₹30,000 | 0 to 150 units |
| 2 kW | ₹60,000 | 150 to 300 units |
| 3 kW and above | ₹78,000 (maximum) | Above 300 units |
We register you on the national portal and take care of the UGVCL approval, inspection and net meter. How the subsidy works
How it works
You deal with one person from the first call until your system is switched on.
- 1
Free site visit
Our engineer comes to see your roof, checks for shade and goes through your last year of light bills.
- 2
Design and quote
You get the system size, expected units, savings and a clear price with the subsidy already shown.
- 3
Subsidy and DISCOM forms
We register you on the PM Surya Ghar portal and file the net meter application with your electricity company.
- 4
Installation
A home system usually goes up in 1 to 3 days, with galvanised structures and tier-1 panels.
- 5
Net meter and switch-on
Your DISCOM fits the new meter, the system is switched on, and the subsidy comes into your bank account.
Solar installation near Deesa
Questions people in Deesa ask us
How much does a 3 kW solar system cost in Deesa?
Most 3 kW on-grid systems in Deesa cost ₹1.6 to 1.9 lakh before subsidy. You get ₹78,000 back from the PM Surya Ghar scheme, so you pay roughly ₹85,000 to ₹1.1 lakh in the end. The exact price depends on the panel brand, inverter and how high the structure needs to be.
How many units will solar panels generate in Deesa?
Around 4.5 units per kW per day on average, which is about 135 units a month. A 3 kW system gives you roughly 405 units a month. Summer months are higher and monsoon months are lower.
Who handles net metering in Deesa?
Uttar Gujarat Vij Company Ltd (UGVCL). We prepare and submit the application, and UGVCL installs the new bi-directional meter after their inspection.
How long does installation take in Deesa?
The panels usually go up in 1 to 3 days once the design is final. The full process, including UGVCL approval, the net meter and commissioning, normally takes 3 to 6 weeks.
Do you also do factories and commercial buildings in Banaskantha?
Yes. We install commercial and industrial rooftop systems and ground-mounted plants from 10 kW up to several MW across Banaskantha, including for dairy, agriculture (potato, castor) and marble & granite units.
