Skip to content
ગુજરાતીમાં વાંચો
SunFitSolar

Solar panel installation in Valsad

We install solar for homes, housing societies, shops and factories in Valsad. We also do the PM Surya Ghar subsidy forms and the DGVCL net meter application, so you don't have to visit any office.

4units

per kW per day in Valsad, on average

  • 5.2 kWh/m² of sun a day
  • DGVCL net metering
  • Up to ₹78,000 subsidy

Free solar quote in Valsad

Free site visit and subsidy help. No pressure to buy.

+91

We'll only use your number to call you about solar.

Is solar worth it in Valsad?

Valsad gets around 5.2 kWh of sunlight per square metre on an average day. That's among the best in India. So a typical 3 kW home system here produces around 360 units a month, which covers most of the bill for an average family. We install rooftop and ground-mounted solar across Valsad city and the villages around it.

Vapi, Sarigam and Umbergaon GIDC are among the largest power users in the state. Valsad town and the surrounding villages also have plenty of independent homes.

Your power here comes from Dakshin Gujarat Vij Company Ltd (DGVCL). We file the net meter application with DGVCL, follow up until the meter is installed, and register you on the PM Surya Ghar portal so the subsidy reaches your bank account.

For businesses in Valsad, mainly chemicals, paper and pharmaceuticals, solar cuts the daytime power cost. A 100 kW rooftop plant here can produce about 1,46,000 units a year.

Good to know in South Gujarat: monsoon months

South Gujarat gets heavy rain from June to September, so generation drops in those months and picks up again from October. We plan your system size on the full-year total, not just the sunny months. Near the coast we also use extra corrosion protection.

Aerial view of a commercial warehouse roof covered with solar panels
  • About 4 units per kW per day in Valsad
  • Net metering with DGVCL
  • Up to ₹78,000 subsidy for homes
  • Tier-1 panels with a 25-year performance warranty
  • Hot-dip galvanised structures that won't rust
  • Free site visit and after-sales service

Solar savings calculator for Valsad

Set your average monthly bill. You'll see the system size, subsidy and how long it takes to pay back.

₹3,000
Recommended system
3.5 kW
Generation per month
420 units
Savings per year
₹35,280
Central subsidy
₹78,000
Your cost after subsidy
₹1,14,500
Payback period
3.2 years

Estimate for a home on-grid system in Valsad, assuming 4 units per kW per day, ₹7/unit and about ₹55,000/kW before subsidy. Your exact quote depends on your roof, panel brand and DISCOM charges.

Get an exact quote

PM Surya Ghar subsidy

If you own a home in Valsad, the central subsidy is paid straight into your bank account once the system is running.

Central subsidy for home rooftop solar under PM Surya Ghar Muft Bijli Yojana.
System sizeCentral subsidySuited to monthly use
1 kW₹30,0000 to 150 units
2 kW₹60,000150 to 300 units
3 kW and above₹78,000 (maximum)Above 300 units

We register you on the national portal and take care of the DGVCL approval, inspection and net meter. How the subsidy works

How it works

You deal with one person from the first call until your system is switched on.

  1. 1

    Free site visit

    Our engineer comes to see your roof, checks for shade and goes through your last year of light bills.

  2. 2

    Design and quote

    You get the system size, expected units, savings and a clear price with the subsidy already shown.

  3. 3

    Subsidy and DISCOM forms

    We register you on the PM Surya Ghar portal and file the net meter application with your electricity company.

  4. 4

    Installation

    A home system usually goes up in 1 to 3 days, with galvanised structures and tier-1 panels.

  5. 5

    Net meter and switch-on

    Your DISCOM fits the new meter, the system is switched on, and the subsidy comes into your bank account.

Solar installation near Valsad

Other towns in Valsad district

Questions people in Valsad ask us

How much does a 3 kW solar system cost in Valsad?

Most 3 kW on-grid systems in Valsad cost ₹1.6 to 1.9 lakh before subsidy. You get ₹78,000 back from the PM Surya Ghar scheme, so you pay roughly ₹85,000 to ₹1.1 lakh in the end. The exact price depends on the panel brand, inverter and how high the structure needs to be.

How many units will solar panels generate in Valsad?

Around 4 units per kW per day on average, which is about 120 units a month. A 3 kW system gives you roughly 360 units a month. Summer months are higher and monsoon months are lower.

Who handles net metering in Valsad?

Dakshin Gujarat Vij Company Ltd (DGVCL). We prepare and submit the application, and DGVCL installs the new bi-directional meter after their inspection.

How long does installation take in Valsad?

The panels usually go up in 1 to 3 days once the design is final. The full process, including DGVCL approval, the net meter and commissioning, normally takes 3 to 6 weeks.

Do you also do factories and commercial buildings in Valsad?

Yes. We install commercial and industrial rooftop systems and ground-mounted plants from 10 kW up to several MW across Valsad, including for chemicals, paper and pharmaceuticals units.

See what solar would save you in Valsad

Send us your bill and a few roof details. We'll tell you the right system size, the price after subsidy and how long it takes to pay back.

Get my free quote
CallWhatsAppFree quote