Rooftop solar in Lodhika GIDC (Metoda) and Khirasara

Lodhika GIDC at Metoda was, by area, the largest estate in MSME-DI's 2012 GIDC table for Rajkot district, and machine shops of the kind found here typically run long, even day shifts that match the solar curve closely. Next door, Khirasara is still being built out, which gives new units a rare chance to design the roof for solar before the shed goes up.

Published by Uday Patel, SunFit Solar · How our guides are made · Last reviewed

SunFit Solar is a free referral service: we call you, then connect you with one checked local installer who visits, designs and quotes. We don't install or sell systems ourselves.

Get a free solar quote

We call you, then connect you with one checked installer near you. Free, no obligation. Gujarat only.

+91

By sending this, you agree we can call you and share your details with one solar installer near you. Nobody else gets your number. Terms and conditions

The biggest GIDC estate in the Rajkot table

When MSME-DI Rajkot compiled its district profile, its GIDC table (as on 2012) gave Lodhika GIDC 424.126 hectares and 1,534 plots, of which 1,494 had been allotted. That single estate made up more than half of all the GIDC land listed for the district at the time, which then still included Morbi. The same profile's list of larger units places CNC automation, bearing, casting and industrial oxygen makers at Metoda.

Plot sizes vary a lot across that area: some units have a few hundred square metres and a single bay, others long pre-engineered halls with crane gantries inside. Solar planning differs sharply between the two, so the sections below treat them separately.

What a Metoda machine shop actually draws

A typical machining unit here is a row of CNC lathes and vertical machining centres, a compressor, some grinders, coolant pumps and lights. These loads ramp up when the first shift starts and stay fairly level until evening, which is close to the shape of a solar day. Units that run a second shift into the night will still use most of their solar output during daylight hours.

Two kinds of neighbour behave differently. Casting units with induction melting draw far more power than any roof can supply, so solar trims only a small share of their bill. Gas plants that separate oxygen and nitrogen from air run large compressors around the clock. In both cases the roof will be fully used, but it covers a modest fraction of demand, and the installer can explain captive or open-access options if you need more.

  • CNC turning and milling: steady day load, high self-use
  • Bearing grinding and finishing lines: long shifts, good match
  • Induction melting: heavy and spiky, roof covers little
  • Air separation and compressed air plants: flat 24 hour load

Flatted sheds: one roof, many tenants

GIDC lists Lodhika among the first locations for its multi-storeyed sheds, where each building holds small units of 100 and 50 square metres. If your workshop is on an upper floor, the roof above is shared, and you cannot simply put panels on it for your own meter.

Group or virtual net metering, which would let several owners split one rooftop plant, is not yet in force in Gujarat; GERC's draft regulations of 2026 propose it. Until that changes, a shared building can usually connect solar only to one meter, most often the one for common lighting, lifts and water pumps. Owners can agree to do that first, and revisit individual shares when the rules allow. A common-services meter in a building like this carries a fairly small load, so a modest system sized to that meter is the safe first step.

Khirasara: build the roof for panels from day one

Khirasara was listed in 2012 as a proposed estate of 495.85 hectares, and by July 2025 GIDC was auctioning plots there alongside Lodhika, Chhatar and Dhoraji. Anyone allotted a plot in these recent rounds is likely still planning the shed.

That is the cheapest moment to plan for solar. Ask your structural designer to allow for the dead load and wind load of panels on the purlins, to keep the main roof face as free of skylights and turbo vents as practical, and to leave space near the main panel for an inverter and a cable route to the meter room. A roof sloping east and west on a long ridge works fine for solar; a north-south ridge gives one face that loses some output. Agree early, too, where the meter room and main LT panel will sit, because a long cable run from the far end of the roof loses power along the way.

PGVCL offices for Metoda and Lodhika

This area sits in PGVCL's Rajkot Rural circle. Under its Rajkot Rural division the office list shows separate Metoda and Lodhika sub-divisions, along with Kuvadava, Shapar-Veraval, Pardi, Paddhari and Ronki. Your bill names the one that serves your connection, and that office handles the meter change and the inspection after commissioning.

Under GERC's rules, systems up to 10 kW skip the technical feasibility study, which suits the smallest workshops. Larger LTMD and HT units here get solar set-off only between 7 am and 6 pm, so a unit's night shift is still billed in full.

Sources

Sources last checked:

This page is general information, not technical, legal or tax advice. Rules and tariffs change, so the installer confirms what applies to your connection at the site survey.

More business and industrial areas in Rajkot

Questions people ask us

My unit is on the second floor of a GIDC flatted shed in Lodhika. Can I get solar for my own meter?

Not easily today. The roof is shared, and Gujarat does not yet allow group or virtual net metering, so one rooftop plant generally feeds one meter. The practical step now is for the building's owners to put solar on the common-services meter.

We are building a new shed in Khirasara. What should we tell the architect?

Ask for purlins and frames designed to carry solar panels, a clear roof face without many skylights or vents, and space and a cable route for the inverter near your main panel. Doing this at the design stage costs far less than strengthening a finished roof.

We run CNC machines in two shifts. Will we have surplus solar on Sundays?

Possibly, if the unit closes on Sundays. On an LTMD or HT connection only power used between 7 am and 6 pm is set off, and unused solar is bought by PGVCL at a lower surplus rate. The installer should size the plant on your weekday daytime load and allow for the weekly holiday.

Does a factory in Metoda get the PM Surya Ghar subsidy?

No. That scheme is for homes and housing societies. A business may be able to use accelerated depreciation on the plant, and your CA can tell you whether that suits your accounts.

See what solar would save you in Metoda (Lodhika GIDC) and Khirasara