Skip to content
ગુજરાતીમાં વાંચો
SunFit Solar

Rooftop solar for units in Naroda GIDC and Hanspura

Naroda is one of Ahmedabad's older GIDC estates, and many of its sheds are decades old. Its chemical and pharma units draw steady power through the working day for chillers, air handling and process equipment, which is the kind of load rooftop solar serves well. Before any design, though, check one thing: at Naroda the name on the bill is not always the same from one lane to the next.

Published by Uday Patel, SunFit Solar · How our guides are made · Last reviewed

SunFit Solar is a free referral service: we call you, then connect you with one checked local installer who visits, designs and quotes. We don't install or sell systems ourselves.

Get a free solar quote

We call you, then connect you with one checked installer near you. Free, no obligation. Gujarat only.

+91

By sending this, you agree we can call you and share your details with one solar installer near you. Nobody else gets your number. Terms and conditions

Torrent or UGVCL: the boundary question

Most of Naroda GIDC is billed by Torrent Power, which holds the licence for Ahmedabad city. Torrent's zone-wise list for solar documents includes a Naroda zone, and its papers go to a Plug Point customer centre in Shahibaug rather than an office in the estate itself.

The catch is that UGVCL also runs sub-divisions called Naroda and Naroda Urban under its Sabarmati Division. Units on the fringe of the estate may get a UGVCL bill. The two routes use different forms, offices and payment pages, so an application filed with the wrong company simply stalls. Look at the top of your latest bill and give the installer that name and your consumer or service number before anything else.

On Torrent supply, business connections fall under Non-RGP, LTMD or HTMD-1. On UGVCL they are Non-RGP, LTMD or HTP-I. The solar set-off rules are the same either way, because they come from GERC.

Pharma and API units: a load that suits daytime solar

An older, undated MSME-DI district profile lists a dyestuff cluster at Naroda with 154 units. Engineering, plastics, textiles, food and packaging fill out the rest.

API and formulation plants run air handling units, chillers and dehumidifiers to keep clean areas within limits, and those run whether or not a batch is in the reactor. That gives a steady base load right through the 7 am to 6 pm window that counts for set-off on LTMD and HT connections. A unit with this kind of profile should be able to use nearly every unit a well-sized roof plant makes, with little left over to sell back.

Dye and intermediate makers are different. Their heavy loads swing with each batch, and many run through the night. For them the useful step is to separate the steady daytime base (utilities, ETP pumps, cooling towers) from the swings, and size solar to the base.

Roofs that have seen decades of use

An estate this old has a wide spread of roofs: early sheds re-sheeted several times, lean-to extensions added between blocks, and multi-floor RCC buildings on plots that were rebuilt. Before panels go on any of them, the installer should check purlins and trusses for corrosion, confirm that fixings will go into sound steel, and see whether older fragile sheets need replacing first. If a roof still has asbestos cement sheets, do not drill or walk on them; replacement is the safer route.

Air quality adds to the wear. In January 2010 the Ministry of Environment and Forests declared Ahmedabad's Naroda and Odhav area a Critically Polluted Area, and a CAG chapter quoting CPCB data gives it a CEPI score of 57.11 for 2018. Coated structures, stainless steel fasteners near acid fumes and regular cleaning are sensible defaults here. On flat RCC roofs, check that rainwater drains freely, since standing water around mounting feet is a common cause of leaks.

Hanspura: the small estate next door

Hanspura GIDC sits beside Naroda and is far smaller: 145 plots covering about 6.7 hectares, with 90 allotted in GIDC's October 2026 table. That leaves 55 plots not yet allotted.

A unit that is still at the drawing stage has an easy advantage. The roof can be planned for panels from day one: a clear south-facing area free of vents, purlins spaced to take mounting rails, a safe ladder or stair to the roof, and a cable route down to the main panel. Adding these at design time costs far less trouble than retrofitting later.

Before you ask for a quote

  • Your latest bill, so the installer knows whether Torrent or UGVCL handles the application and which tariff category you are on
  • Twelve months of consumption, plus any interval data from your meter showing daytime use
  • Roof drawings or at least measurements, and a note of stacks, vents and planned extensions
  • If the shed is rented, the plot holder's written consent; GERC allows solar on rented premises and developer-owned systems
  • Your CA's view on accelerated depreciation, since businesses do not get the PM Surya Ghar home subsidy

Sources

Sources last checked:

This page is general information, not technical, legal or tax advice. Rules and tariffs change, so the installer confirms what applies to your connection at the site survey.

More business and industrial areas in Ahmedabad

Questions people ask us

My unit is near the edge of Naroda and the bill says UGVCL. Is the process different?

The GERC rules are the same, but the paperwork goes to the UGVCL sub-division named on your bill, not to Torrent's Plug Point. Your installer should prepare the UGVCL forms and you pay the meter estimate through the state DISCOM route.

We are an API unit with cleanrooms. How much of our load can solar cover?

That depends on roof area and how much your air handling and chillers draw in daylight. A unit with a steady daytime base load should use almost all the solar it generates, but the exact share has to be worked out from your meter data.

Several units share one building in Naroda. Can each put solar on the common roof?

Group or virtual net metering is not in force in Gujarat; GERC published draft regulations in 2026 that propose it. For now a system connects to one meter, often the common-services meter, unless each unit has its own marked roof area and connection. Settle roof rights with the other occupants and GIDC first.

Is it worth building a new shed in Hanspura with solar in mind?

Yes, if you expect to add solar within a few years. Planning roof layout, structure and cable routes now avoids changes later. The installer can share a rough roof plan with your architect.

See what solar would save you in Naroda GIDC

Tell us your bill and a few roof details. We'll call you, then connect you with one checked installer near you, who visits your site and gives you a quote.

Get my free quote
CallWhatsAppFree quote