Skip to content
ગુજરાતીમાં વાંચો
SunFit Solar

Rooftop solar for the Morbi and Wankaner ceramic belt

A tile plant in Morbi grinds, presses, glazes and polishes around the clock, and every one of those steps runs on electric motors even though the kiln burns gas. That makes the cluster one of the few places in Gujarat where a large factory roof can be filled with panels and almost every unit it makes will be used on site. The catches are dust, heat over the kiln hall and a roof that is often not as strong as it looks.

Published by Uday Patel, SunFit Solar · How our guides are made · Last reviewed

SunFit Solar is a free referral service: we call you, then connect you with one checked local installer who visits, designs and quotes. We don't install or sell systems ourselves.

Get a free solar quote

We call you, then connect you with one checked installer near you. Free, no obligation. Gujarat only.

+91

By sending this, you agree we can call you and share your details with one solar installer near you. Nobody else gets your number. Terms and conditions

How the cluster grew

The MSME-DI Rajkot district profile, with data from around 2012, recorded 597 functional units in what it called the Thangadh, Wankaner and Morbi ceramic triangle: 150 micro, 297 small and 150 medium. The belt has kept growing since then, so treat that as a dated floor rather than today's count.

The same 2012 profile explains why the industry grew here at all. It says most of Gujarat's fire clay came from the area, which drew fire-brick and then ceramic makers into Morbi and Wankaner talukas. Many of today's plants sit along the highways and village roads around Lalpar, Makansar, Jambudia and Trajpar rather than inside the four small GIDC estates listed in the glance table.

Gas fires the kiln, electricity does everything else

Kilns and spray dryers in the belt are fired with piped gas or propane, and that fuel bill is outside what solar can touch. When gas prices jump, a rooftop plant does nothing for the kiln, and it is better to hear that from the start.

The electricity bill is a different story. Ball mills grind the body slip for hours at a stretch, hydraulic presses cycle all shift, kiln and dryer fans never stop while the line is hot, and glaze lines, compressors and conveyors run alongside them. On a vitrified tile line, the polishing and squaring machines are among the heaviest electrical sections in the plant.

  • Ball mills and slip pumps: long, steady motor load
  • Presses and hydraulic power packs: high load in every shift
  • Kiln, dryer and exhaust fans: continuous while firing
  • Polishing, squaring and calibrating lines: large motors, daytime and night
  • Air compressors, conveyors, packing and lighting

Why a 24 hour plant uses all of its solar

Because the line rarely stops, a tile plant's daytime demand is almost always bigger than anything its roof can produce. Bigger plants tend to take HT supply, where GERC counts solar only against power drawn between 7 am and 6 pm on the same day. For many factories that window is a limit. For a Morbi plant it seldom bites, since the daytime load swallows the whole output and there is little or no surplus to sell back to PGVCL at the lower surplus rate.

So the real ceiling is roof area and roof strength, plus the regulation's limit of 1,000 kW per rooftop project. Even a fully covered roof will usually offset only a slice of a large plant's monthly units. Plants that want more than the roof allows can ask the installer about captive and open-access routes under Gujarat policy.

Clay dust, kiln heat and the roof itself

Body powder from the press section and dust from raw material yards settle on glass within days in the dry months, and the fine mineral dust is abrasive. Plan cleaning as a routine job with soft water and soft brushes, not a dry wipe that scratches the coating, and leave walkways between rows so the cleaning crew can reach every panel safely.

Heat is the second issue. The roof right above a roller kiln runs far hotter than the rest of the shed, and panels lose output as they get hotter. A careful layout keeps modules over the press, glazing, sorting and warehouse bays, away from ridge ventilators, roof monitors and stack outlets over the kiln hall.

Long kiln sheds were often built with light purlins and thin sheeting. Ask for a structural check of purlin size and sheet condition before anything is clamped on, and replace rusted or brittle sheets first.

PGVCL offices from Lalpar to Wankaner

PGVCL's Morbi circle runs three divisions. The Morbi division lists Town 1, Town 2, Rural, Tankara, Lalpar, Shanala, Pipaliya and Jetpar sub-divisions, which between them cover most of the belt around Morbi town. The Wankaner division has Town, Rural 1 and Rural 2 sub-divisions for the Dhuva and Sartanpar side. The office named on your bill is the one that will inspect the plant and change the meter.

Sources

Sources last checked:

This page is general information, not technical, legal or tax advice. Rules and tariffs change, so the installer confirms what applies to your connection at the site survey.

Industrial Solar across Gujarat

Questions people ask us

Our vitrified tile plant runs non-stop. How much of the roof should we cover?

Usually as much as the structure safely allows. A 24 hour ceramic line uses daytime solar as fast as the roof makes it, so surplus is rarely a worry. The limits are roof strength, shade from stacks and ventilators, heat over the kiln hall and the 1,000 kW cap per rooftop project under GERC's net metering rules.

How often will panels need washing in the ceramic belt?

More often than in a town. Press dust, raw material dust and road dust from truck traffic build up quickly between October and May. A wash every week or two in the dry season, with soft water and soft brushes, is a sensible starting point. The installer can tell you how fast output is dropping between washes once the plant is running.

Will solar protect us from gas price spikes?

No. Kilns and spray dryers run on gas or propane, and solar only replaces grid electricity. It lowers the electrical part of your energy bill and leaves the fuel part unchanged.

We rent our shed near Wankaner. Can we still put solar on it?

Yes. GERC's rules allow rooftop solar on rented premises, and a third party can own the system. You will need the owner's written consent, and the lease should say what happens to the panels if you move out.

Is there a government subsidy for factory rooftop solar in Morbi?

The PM Surya Ghar subsidy is only for homes and housing societies, not factories. Businesses may be able to claim accelerated depreciation on the plant, so ask your CA how that applies to you.

See what solar would save you in Morbi ceramic cluster

Tell us your bill and a few roof details. We'll call you, then connect you with one checked installer near you, who visits your site and gives you a quote.

Get my free quote
CallWhatsAppFree quote